MECHANICAL ENGINEERING DEPARTMENT

Process Piping

BPMS engineers are proficient in CAESAR II Pipe Stress Analysis program. BAEC believes that the use of this software is the standard against which all others piping software are measured and compared. The CAESAR II spreadsheet input technique revolutionized the way piping models are built, modified, and verified. CAESAR II was the first pipe stress program specifically designed for the PC environment. The interactive capabilities permit rapid evaluation of both input and output, thereby melding seamlessly into the "design - analyze" iteration cycle.

CAESAR II incorporates a wide range of capabilities, from numerous piping codes, to expansion joint, valve & flange, and structural databases, to structural and buried pipe modeling, to equipment and vessel nozzle evaluation, to spectrum and time history analysis. This enable BPMS engineers to optimize piping design configuration within code limits of stress, elongation, displacements and other stress/forces parameters. This program was used in various projects in BSP such as the AMDP-12, CP-3 Intermediate Deep and Champion 7 De-Bottlenecking project.

HVAC & Refrigeration:

  • Steam Boilers
  • Hot Oil Boilers Centrifugal chillers (Open & Hermetic)
  • Absorption Chillers
  • Reciprocating Chillers
  • Hot Water Storage
  • Ice Making, Blast Freezers & Plate Freezers
  • Cooling Towers
  • Fire Protection

Fundamental to every Oil & Gas facilities and even building project are fire protection systems that will provide the opportunity to reduce or eliminate fire damage by way of automatic and manual fire extinguishing systems. By designing these comprehensive systems for a variety of facility types over the course of many years, coupled with a focus on compliance with client fire and life safety standards, model building/fire codes, National Fire Protection Association (NFPA) standards and insurance carrier recommendations, BPMS engineers has achieved an good reputation as a design leader. Our design experience includes:

  • Wet Pipe Systems
  • Dry Pipe Systems
  • Foam Systems
  • Deluge Systems
  • Automatic Wet Systems
  • Automatic Dry Systems
  • Semiautomatic Dry Systems
  • Manual Wet Systems
  • Manual Dry Systems
  • Air Aspirating Smoke Detection Systems
  • Smoke Detection Systems - Heat Detection Systems
  • Clean Agent Systems (e.g. Halocarbon & Inert)
  • Carbon Dioxide Systems

Plumbing/Sanitary System

BPMS Engineers has long been involved in the planning, conceptual and detailed design of sophisticated piping systems. Our experience includes:

  • Sanitary Waster and Vent
  • Storm and Roof Drainage
  • Clearwater Water Waste and Vent
  • Process Waste and Vent
  • Corrosion Resistant Waste and Vent
  • Domestic Hot and Cold Water
  • Laboratory Hot and Cold Water
  • Process Hot and Cold Water
  • Non-Potable Hot and Cold Water
  • Make-Up Water for Mechanical and Process Equipment

ELECTRICAL ENGINEERING DEPARTMENT

BPMS uses ETAP, EDSA, DAPPER/CAPTOR, EZPower, etc. for its analysis of electrical engineering design for onshore/offshore and power plant respectively. BPMS has experience in performing power systems studies with power system analysis software (ETAP, EDSA, DAPPER/CAPTOR, EZPower, etc.); solid design engineering work experience in the area of offshore, or utility power systems; and experience in testing and commissioning of electrical power equipment such as type testing, field testing, and factory testing. In addition our engineers knowledgeable with MS Office Applications e.g., Word, Excel, Access, PowerPoint; working knowledge of and/or AutoCAD.

On small to large projects our senior engineers can oversee a team of engineers, designers and drafters to develop and assemble the contract packages in accordance with the project objectives; and developing detailed design of electrical systems for capital projects such as Tutong Power Station, AMDP-12 platform, Champion De-bottlenecking and CP-3 Intermediate Deep Gas Development for Brunei Shell Petroleum.

Developing the Electrical Single Line Diagrams; performing Short Circuit, Load Flow, and other Power System studies to insure appropriate equipment ratings and power system performance; performing Protective Relay Coordination Studies; defining Protective Relay Settings and coordinating second level reviews with internal experts; developing motor control and motor restart strategy; working with the Project Team to develop and document the Electrical Area Classification details and drawings; and working with Electrical Equipment Suppliers and internal procurement organization to develop major electrical equipment order specifications.

How to Reach us!

Address:                                               

A117, 1st Floor, Bangunan GP Satu,    
Mile 2, Jalan Gadong,                         

Bandar Seri Begawan BE3919,            

Negara Brunei Darussalam.                 

Tel:     673-2448782 / 2448783                  
Fax:    673-2448806                               
Email: This email address is being protected from spambots. You need JavaScript enabled to view it.

correspondence address:

P. O. Box 1342,
Gadong Post Office,
Bandar Seri Begawan BE3978,
Negara Brunei Darussalam.

Quick Links:

Home About Us Our Works
Projects Contact Us


Locate Us